Plant/Steel Bridge/FA > Steel Bridge > Capability Engineering


Doosan Mecatec Bridge Division has an automatic 3D design system requiring only the minimum data input, while boasting the Korea's best engineering technology with structure analysis and bridge analysis program.
Doosan Mecatec meets the deadline by creating BOM and flawless designs within the shortest period of time by using the automatic design system in the order of Basic Design Date Input-> Road Alignment Calculation-> Manufacturing Design -> 3D MODEL -> PIECE DWG -> CUTTING PLAN.
Doosan Mecatec has the best engineering capacity to carry out projects with the technology for additional design and modifications on weak points through the structural analysis on critical points in order to ensure the safety of manufacturing and construction as well as the stability of bridge by studying the structural calculation on the basic design.
Doosan Mecatec's technology was highly recognized by the client and main contractor by having successfully carried out the construction project for Incheon International Airport Yeonyuk Bridge according to the analysis and installation procedure, while conducting an analysis by different stages of the project and choosing the optimal installation methods for special bridges in order to meet the deadline.